Author: Van Anda Improvement District

Newsletter Dec 2025

Newsletter Dec 2025

WELCOME TYLER

Please help us welcome Tyler Andres to the VAID Water Operations team! Tyler started training as a water operator on Nov 1, and his strong work ethic and upbeat attitude are already making a big difference.

METER PROJECT UPDATES

Work has started on installing a new water line for the Copper Queen area. These homes were previously connected through lines running across properties, so this upgrade will make things much more reliable. Please take extra care in the area and use alternate routes when you can.

We’ve received the meters and most of the hardware. VAID operators have already installed some meters where a meter setter was already in place.

All costs for this project are covered by Provincial Government funding.

PLANNED WATER OUTAGES

There will be water outages during the meter installation project, usually affecting only small sections at a time. We’ll post notices on the website, Facebook page, and send emails. We’ll also try to call you before your meter is installed—so if your phone number has changed, please update it with us.

RATE INCREASE FOR 2026

Heads up that rates will increase by at least 10% in 2026. A full report explaining the reasons behind this will be available.

FIREFIGHTERS NEEDED!

The Fire Department needs volunteers! Training, gear, 24-hour accident coverage, a volunteer tax credit, and more are provided, with all costs covered.

If you’re interested, contact Fire Chief Mark Robert at 604-414-9662 or firechief@vananda.ca

NEXT MEETING

The next Regular Board Meeting will be held Wednesday, Dec 17 at 1:30pm, upstairs at the Firehall.

CONTACT INFO

Questions or feedback? contact@vananda-id.ca | 604-486-7035

WATER EMERGENCY: 1-672-882-9901


In Appreciation of Bob Timms

Dear Timms Family,

On behalf of the Van Anda Improvement District, we wish to extend our sincere appreciation for Bob’s long-standing service to our community. His dedication supported all of us more than we may ever fully realize.

Recently, Bob’s brother Dan shared how it was Bob’s persistence, determination and clear-eyed advocacy that led to the acquisition and installation of our new water tank. How he refused to accept anything less than what the community deserved. “Well, that’s not acceptable,” he’d say. And with that unwavering resolve, he ensured that Van Anda received the treatment, respect and attention it needed from the Regional District. That resolve has benefited every household here.

Bob and Maggie have been central to this community for many years. Their care, their time and their continued presence ripple outward in ways that will be felt for generations. We are deeply grateful for everything they have brought to the life of this village.

Please accept our heartfelt thanks and recognition for Bob’s years of service, commitment and community stewardship. His work continues to nourish and protect us every day.

With gratitude,

  • Van Anda Improvement District Trustees and Staff

Water System Update – Leak Located and Temporarily Repaired

Water System Update – Leak Located and Temporarily Repaired

The Improvement District is pleased to report that the leak affecting the distribution system has been located and temporarily stopped. Operators and our regular contractor performed interim work yesterday to halt the water loss, and a permanent repair is scheduled for Monday.

Thanks to this prompt response, the community’s water supply was not impacted.

We appreciate the community’s engagement and suggestions during the investigation. Some residents have asked about installing additional mainline meters to help isolate leaks more quickly. While customer meters are being installed and are covered 100% by government funding, mainline meters are significantly more expensive. They require large, engineered chambers capable of long-term traffic loading and controlled access, which makes installation far more complex than residential metering—and currently, there is no government funding available for mainline meters.

The Board continues to review these types of system improvements as part of long-term infrastructure planning, balancing cost, benefit, and practicality.

As always, residents are encouraged to report any unusual water flow or activity, as community observations often help narrow down issues faster.

Thank you for your patience and support.

LEAK ALERT!

LEAK ALERT!


Residents are advised to be alert for leaks in the water system. Water production has doubled, and the plant is nearing capacity. Please report any leaks immediately to the Water Operator at1-672-882-9901 or the office at 604-486-7035

Thank you for your cooperation.

Copper Queen Water Work & Planned Outage – Thursday, Nov 27

Copper Queen Water Work & Planned Outage – Thursday, Nov 27

Ongoing Work:
Work has begun to install a new water line for the lower Copper Queen area. These homes currently rely on lines running across neighboring properties and will soon connect directly to the main water line as part of the Meter Project. Please use extra caution in the area and take alternate routes where possible.

Planned Water Outage – Thursday, Nov 27:
Water will be temporarily shut off for a few hours on Thursday, Nov 27, to allow for valve installation on Copper Queen.

Future Planned Outages:
During the meter installation project, there may be additional short water outages, usually affecting only small sections at a time. Notices will be posted on our website, Facebook page, and sent via email. We will also try to call you before your meter is installed—please ensure your phone number with us is up to date.